Toolbox talk

Site housekeeping

Shaun HolmesAbout 5 minutes

I've spent over 20 years in UK construction, and the trip I still see most often is a length of timber left in the walkway.

This talk supplements the site's own risk assessment and method. It does not replace them, and it is not a substitute for competent health and safety advice.

Read this out

This talk is about keeping the site so people can move. The slips talk is the same family of harm, from the point of view of the floor and the footwear. This one is about what we leave behind us: materials, waste, leads and deliveries. HSE says contractors and others in control of construction sites must manage the work so people can move safely around the site. The site should be kept clean and orderly, to reduce injury from slips and trips. Everyone can contribute. If you see a risk, sort it, or report it to someone who can.

HSE's construction slips page gives the scale, and I am using those words rather than a newer count of my own. Several thousand construction workers are injured each year following a trip or slip while at work on a building site. Around 1,000 of those injuries involve someone fracturing a bone or dislocating a joint. Most could be avoided by managing working areas and access routes, such as stairwells, corridors, footpaths and site cabins. Involving people helps find the bad spots and gets near misses reported. See it, sort it.

Uneven surfaces are one cause. Many slips and trips happen when people walk on them. HSE says reduce that by walkways that are clearly designated, with good conditions underfoot, signposted, and with adequate lighting. Use a mechanical lifting aid rather than carrying a load that blocks the view ahead. Footwear needs a good grip. A walkway that exists on a drawing and not on the ground is not a walkway. If the route we actually use goes through the materials, that route is the one we tidy.

Obstacles are the other everyday cause. HSE says slips and trips happen because something is in the way, such as building materials or waste. The controls on that page are housekeeping, deliveries and waste. Housekeeping means everyone keeping their work and storage areas tidy, not a clean-up at the end of the week by whoever is last. Deliveries should be planned to minimise the amount of material on site. Waste needs designated areas, skips and bins where they are needed, and a clear responsibility for who removes it. A skip that is full, with the next load landing on the floor, is a failure of that plan.

Trailing cables are a trip and a snag. HSE says if you can use cordless tools you may not need cables. Where you need a cable for temporary lighting or a mains tool, run it at high level, especially along corridors. A lead across a doorway is a choice. It is a bad one. The electrical talk covers whether that lead should be on site at all. This talk covers where it lies.

Wet and slippery surfaces get treated, not admired. HSE says treat them with stone for mud, or grit for ice, or provide a temporary covering. Signpost slippery areas, and make sure footwear with a good grip is worn. A sign that stays up over a dry floor teaches people to ignore the next one. If we made it wet, we deal with it and we keep people off it until we have. Changes in level, such as a doorway, should be a ramp where you cannot avoid the change. If you cannot ramp it, sign it so people look for the step.

Housekeeping is also what the next trade inherits. Offcuts in a corridor are a trip for us and a trip for the customer, the delivery driver, and the person who comes to quote. Stacks that can topple are a housekeeping problem as well as a manual-handling one. HSE's public-protection page, which the shutdown talk uses in full, says store materials so they cannot topple or roll, and store them inside the boundary rather than against the fence. During the working day the same habit applies. Do not leave pipes, rings or bags where the next person knocks them over.

The practical close of this talk is a walk, not a speech. Before the next task, look at the route we will actually use, including the stairs and the way to the van. Move what is in it. Put waste where the skip is, not where the skip will be later. Get leads off the floor or off the tools. If the floor is muddy from us, treat it or cover it, and say so. If you see it and you cannot sort it, tell the person who can, today, not at the end of the job.

Key points

  • HSE: several thousand construction workers a year are injured by a slip or trip on site. Around 1,000 of those injuries are a fracture or a dislocation.
  • Keep the site clean and orderly. If you see a risk, sort it or report it.
  • Walkways should be clear, signed, lit, and decent underfoot. Do not carry a load that stops you seeing your feet if a barrow can do it.
  • Plan deliveries so material does not pile up. Give waste a place, a bin, and a person who removes it.
  • Cordless where you can. Otherwise run cables at high level, especially in corridors.
  • Mud gets stone, ice gets grit, or cover it. Sign the slippery bit, and the step you cannot ramp.

Questions to ask

  1. What is in the route we will walk in the next hour, including the stairs and the way to the van?
  2. Where is today's waste going, and who takes it there before it is underfoot?
  3. Which leads are across a walkway, and can that tool be cordless or the lead be up high?
  4. Is any floor wet or muddy because of our work, and what are we doing about it now?
  5. What delivery is coming, and where does it land so it is not in the walkway?

Attendance and sign-off

Print this sheet for the people who were in the briefing. It is one A4 page on its own when you print the sheet. The whole talk prints with the sheet on a new page. Pop your email in the first time. After that, the buttons print straight away.

Toolbox talk sign-off

Site housekeeping

This talk supplements the site's own risk assessment and method. It does not replace them, and it is not a substitute for competent health and safety advice.

Site or job
Date
Supervisor
Talk started

I was at this briefing and I had the chance to ask a question. Signing does not replace the site risk assessment.

No.NameTradeSignature
1
2
3
4
5
6
7
8
9
10
11
12

Supervisor signature

Time finished

Sources

Read on 19 October 2026. The links are the pages the talk was taken from. None of them are affiliate links.

Related: Slips, trips and falls, Manual handling, Blank toolbox talk template.

Other talks

Free toolbox talk pack

All 21 talks and a blank sign-off sheet, on one page you can print. The talks stay on this site to read. Opening the pack asks for an email the first time, the same as printing a sheet.

Free every week

A new free toolbox talk and one useful AI tip every week. One email. Unsubscribe any time. The pages stay open to read. The Word file, the PDF, and the sign-off sheet ask for an email once.

Unsubscribe any time. Privacy notice.

Free tools for a day rate, a tax estimate, a CIS deduction, and materials are on the tools page.

Get it free every week