Guide
If AI drafts it, who signs it? What UK builders and designers still own under the Building Safety Act
Shaun Holmes
If a tool drafts a drawing, a named person still checks it and signs it. Dutyholders under the Building Regulations in England.
If a tool drafts a drawing, you still check it, and you still put your name on what you are willing to hand over. In England, the Building Regulations put that design duty on a person. They do not put it on the software.
I've spent over 20 years in UK construction. Plastering and drylining is my trade, and I have worked alongside builders. I am not an architect, and I am not a building control officer. I do not decide whether a design complies. We search the AI world every week so you don't have to. The pages next to this one are what not to put into ChatGPT, PlanAssist, and the RAMS guide.
Last checked: 4 Nov 2026.
I read these pages that day. The legal duties below are the England duties on the pages linked. I have not set out Scotland, Wales or Northern Ireland.
- AI in design will be shaped by who signs the drawings (opens in a new tab), Eleni Stefania Kalapoda, Construction Management, 30 October 2026
- AI in Construction: Opportunities, Risks and the Governance Challenge (opens in a new tab), Construction Excellence Midlands, 2 November 2026
- Design and building work: meeting building requirements (opens in a new tab), GOV.UK
- The Building Regulations 2010, Part 2A (opens in a new tab) on legislation.gov.uk. The footnote on the regulations linked below says this Part was inserted for England on 1 October 2023 by the Building Regulations etc. (Amendment) (England) Regulations 2023 (opens in a new tab). Regulation 1 of those regulations says they come into force on 1 October 2023
- Building control approval for higher-risk buildings (opens in a new tab), GOV.UK
- Applying for a completion certificate (opens in a new tab), GOV.UK, last updated 1 October 2026
- Making changes to a higher-risk building project (opens in a new tab), GOV.UK, last updated 1 October 2026
- Keeping information about a higher-risk building: the golden thread (opens in a new tab), GOV.UK
- Building control FAQ explainer (opens in a new tab), Building Safety Regulator
On 4 November 2026, legislation.gov.uk showed regulations 11D, 11E, 11F, 11K and 11L as up to date with all changes known to be in force on or before 3 November 2026. Regulation 11P said on or before 4 November 2026. Regulation 11Q said on or before 3 November 2026. The pending changes listed beside those pages were about Schedule 1 Part L and a new regulation 40C. They were not a new wording of the dutyholder rules I have used here.
Who the duty sits with
Kalapoda, in Construction Management on 30 October 2026, writes that the future of AI in design will be decided less by the software than by the people who sign the drawings. She writes that the Building Safety Act has already answered who is responsible, and that since October 2023 the Building Regulations have named five dutyholders: the client, the principal designer, the principal contractor, designers and contractors, each of whom must be competent for their role. She writes that AI changes how design information is made, and does not change who is responsible for it. She also writes that AI cannot be a dutyholder, and that before anyone shares AI-assisted work, a competent person should review it, accept it, and put their name to it, as they would for a junior colleague's work.
That five-name sentence is hers. I have not quoted a section of the Act that lists those five names. The duties I can show you are in Part 2A of the Building Regulations 2010.
Regulation 11Q (opens in a new tab) says design includes drawings, design details, specifications and bills of quantities relating to a building, and calculations prepared for the purpose of a design.
Regulation 11K (opens in a new tab) says a designer must not start design work unless satisfied that the client is aware of the duties the client owes. When carrying out design work, the designer must take all reasonable steps to ensure that if the building work were built in accordance with that design, the building work would comply with all relevant requirements.
Regulation 11L (opens in a new tab) says a contractor must ensure the building work they carry out complies with all relevant requirements. A contractor must not start that work unless satisfied the client is aware of the duties the client owes.
Regulation 11F (opens in a new tab) says any person carrying out building work or design work must have, where the person is an individual, the skills, knowledge, experience and behaviours necessary, or, where the person is not an individual, the organisational capability. Regulation 11E(6) (opens in a new tab) says a request to do the work must not be accepted if the person does not meet that competence test at the time of the appointment. The exception in regulation 11F is a trainee. The person who asked the trainee to do the work must make sure they are adequately supervised. A person in training to be a principal designer or a principal contractor must not be appointed to that role.
GOV.UK's guide to these duties (opens in a new tab) says individuals must be able to refuse work beyond their competence, refuse non-compliant work, and ask for assistance. It says any individual or organisation that carries out work beyond their competence or organisational capability can face enforcement action.
Where there is only one contractor, regulation 11D(6) (opens in a new tab) treats that contractor as the principal contractor. Where that is the case and there is only one designer, regulation 11D(7) says that designer must fulfil the principal designer duties. The same GOV.UK guide says that if the project has only one designer, they are the principal designer, and if it has only one contractor, they are the principal contractor. Read the guide and regulation 11D together. I am not going to shorten either of them.
A domestic client, on that GOV.UK page, is any individual who has building work carried out on their home, or the home of a family member, for domestic purposes rather than business. The page says that if a domestic client does not appoint a principal designer or a principal contractor, the designer in control of the design phase is the principal designer, and the contractor in control of the construction phase is the principal contractor.
That is the small-firm version. On a house it is often you. If you produced the drawing, you are in the designer duty. If you are the only contractor, regulation 11D treats you as the principal contractor, and regulation 11L still applies to the work you carry out. You check the sheet against the job. You put your name on the copy you are willing to issue, or you do not issue it.
I have not found a rule that says every house drawing needs one particular kind of signature. What I have found is the designer's duty to take those reasonable steps, the contractor's duty to carry out compliant work, and, on a higher-risk building, a signed compliance declaration. That declaration is in the next section but one. Kalapoda's working rule, which I am using here, is that a named competent person reviews the output and puts their name to it. Regulation 11F is written for a person. I am not going to treat a chat account as that person.
This is not the same job as a RAMS. The GOV.UK guide says the CDM roles of client, principal designer and principal contractor are there to manage the health and safety of workers and anyone around the site during the work. The building regulations roles are there to make sure design and building work complies with building regulations. It says the competence requirements differ. The RAMS guide is the health and safety paper. This page is the drawing and the specification.
There is a limit I am not going to flatten. Regulation 11P (opens in a new tab) says a client is not required to comply with this Part where the building work or design work consists only of work described in Schedule 4. I have not turned that schedule into a list of jobs you can skip. If you think the job is minor, read Schedule 4 on legislation.gov.uk.
Get it free every week
A weekly email on what to check before a drawing or a specification goes out with your name on it.
What I would do before my name goes on it
Kalapoda sets out five steps: record where the information came from, give every output a name, anchor the review to the gateways, treat every regeneration as a change, and build the use of AI into appointments and competence. She presents them as a way to use the rules that already exist. I have not found them written as a new regulation. The checks below are the ones I would use, including on a small job. Where a step only belongs on a higher-risk building, I have said so.
-
Decide whether you are doing design work. A drawing, a design detail, a specification or a calculation sits inside the definition in regulation 11Q. If you are not competent for that work, do not start it, and do not let a fluent drawing talk you into it. GOV.UK says you refuse work beyond your competence and ask for help. If you are only building from someone else's drawing, you are on the contractor side. Regulation 11L says the work you carry out has to comply. You do not build from a sheet you have not read against the job.
-
Read it, then put your name on it. Before you send a drawing, a specification or a calculation that a tool helped to draft, a person who is competent for that work reads it, takes out what they will not stand behind, and puts their name on it. Kalapoda's line is that AI cannot be a dutyholder. That is the rule I am using: the name on the sheet is a person.
-
Write where it came from. On the drawing, or in the file you keep with the job, write which tool, which version if the tool shows one, what you asked it, and who checked it. Kalapoda says that belongs in the metadata, and that most common data environments can already carry it. If you do not have one of those systems, write it on the sheet. I am not going to invent a field name.
-
On a higher-risk building, do not fix an early draft into the application. Kalapoda says the tools are used most heavily at the start, in option studies, massing and early compliance checks, and that this is the information that feeds a Gateway 2 application. She says teams should set review points before that work is fixed into the submission, with the principal designer's sign-off recorded. The Building Safety Regulator's FAQ calls Gateway 2 the hold point where work can only start after BSR building control approval. GOV.UK says the client must make sure that approval is granted before any building work starts, and that carrying out building work without the required approval is a criminal offence. A house that is not a higher-risk building is not that application. The height and the use are in the next section.
-
If you generate the drawing again, read it again. Kalapoda says a change-control plan should state that a regenerated output is a change to be assessed, recorded and, where required, notified, however minor it looks. On a higher-risk building that already has building control approval, GOV.UK says any change to the agreed documents is a controlled change. You manage and assess it under the change control plan, and you record it in the change control log. Some changes you must tell BSR about before the related work starts. A major change must not be carried out until BSR approves it. I am not choosing the category for you. The page is making changes to a higher-risk building project (opens in a new tab). On a job that is not a higher-risk building, I still would not let anyone build from a drawing I had not re-read after the tool redrew it.
-
If a client asks how you use a tool, say so where the appointment is written. Kalapoda says clients should ask how designers and contractors use AI, and that appointments should set expectations on disclosure, verification and data handling. She also says that knowing when to question a machine's answer is now part of the job. GOV.UK points principal designers to PAS 8671 and principal contractors to PAS 8672, and says compliance with a PAS, or any other standard, does not guarantee you have met all the legal duties. I am not telling you to buy a standard. The check is still yours.
-
Leave the name and the address out of the chat. A title block is often the customer's name, the site address and a phone number. That stays out of the paste. The list is what not to put into ChatGPT. Cover the title block, or do not upload the file. Type the question.
The price and the start date are still separate. If the job is an extension or a loft waiting on planning, PlanAssist is why I would not print a decision week. A planning decision and building regulations approval are not the same date.
Higher-risk buildings are a smaller set of jobs
GOV.UK says a higher-risk building has at least 7 storeys or is at least 18 metres high, and has at least 2 residential units or is a hospital or a care home. A higher-risk building with at least 2 residential units must be registered with the Building Safety Regulator before people live there.
Do not apply to BSR for building control approval for a building that is not a higher-risk building. GOV.UK says those jobs use a separate process, through a local authority or a registered building control approver.
For a higher-risk building, the same page says you must get BSR's approval before you start construction of a new one, work to an existing building that makes it a higher-risk building or stops it being one, or work to an existing higher-risk building. Work to an existing higher-risk building is excepted on that page where it consists only of exempt work, competent person scheme work, fibre optic cabling work or emergency repairs. BSR uses the application to check that the proposed work will comply, that the client will manage the project, and that the people appointed are competent to do their job.
The BSR FAQ calls Gateway 3 the hold point where the higher-risk building must pass BSR's checks before occupancy. GOV.UK's completion certificate guidance (opens in a new tab) says that when the work on a higher-risk building is complete, you apply for a completion certificate. The documents it says you upload include compliance declarations signed by each principal designer and principal contractor on the project, confirming they have fulfilled their duties under building regulations, and a client confirmation statement signed by the client, confirming that to the best of their knowledge the building works meet the relevant building regulations. It also says you need a completion certificate to register a higher-risk building that has at least 2 residential units. I am not turning that registration line into a rule for every hospital or every care home. Read the page for the building in front of you.
The golden thread, on GOV.UK, is the name it uses for the information a client, principal designer or principal contractor must keep as a digital record on a project that involves a higher-risk building, and that an accountable person or principal accountable person must keep for a high-rise residential building. During design and construction, the client must keep information that describes the building and shows how it complies with building regulations, including how those responsible comply with their duties. The page says the system should have version control so users can see any changes. The principal designer must capture and keep all of the design information up to date. Kalapoda describes that record as accurate and living: how the building was designed, built and changed. She writes that the framework does not mention algorithms, and does not need to. None of the GOV.UK pages linked here uses the word algorithm.
She also writes that, used well, the tools can catch coordination errors earlier, test fire and environmental scenarios more thoroughly, and keep that record more complete than a manual process, and that this rests on someone remaining accountable. I am not treating that as a measured result. No figure for it was on the page.
What the Midlands note adds
Construction Excellence Midlands, dated 2 November 2026, reported a session at the West Midlands Construction Summit 2026. The speaker it names is Amardeep Gill, partner at Trowers & Hamlins. The note says the session looked at uses including design optimisation, programme analysis, contract management, site safety monitoring and predictive asset management, and at keeping governance, accountability and oversight around that use.
The risks it lists include inaccurate outputs, bias, cyber security concerns, accountability gaps, and over-reliance on automation. The line I am taking from it is the one that matches the drawing: an inaccurate output still needs a person. The note says the session's own summary was that adoption needs governance, transparency and human oversight, if the benefits are to sit alongside trust and accountability.
I am not adopting the rest of that note as advice for a sole trader. It says one theme was that AI is no longer optional for construction businesses and is increasingly a board-level issue. That is the session's theme. It is not a duty I found on GOV.UK. The note also lists the EU AI Act among the legal topics of the talk, with data protection, discrimination, intellectual property and negligence. The page says a slide deck is available. I have not opened that deck, and I am not setting out what the EU AI Act requires of a UK firm.
What this will not do
It will not make a tool the person who signs. It will not tell you that you are competent. It will not tell you a house, a loft or a shop is a higher-risk building. It will not choose whether a change is one you only record, one you must notify, or one you must not build until BSR approves it. It will not set out the law in Scotland, Wales or Northern Ireland.
The pages will move. The links above are the ones I read on 4 November 2026.
If you use a tool this week, use it on one drawing you were going to check anyway. Write the tool on the sheet. Read the sheet against the job. Put your name on it, or do not send it.
Common questions
If AI drafts a drawing, who is responsible in England?
The Building Regulations put the design duty on the person doing the design work. Regulation 11K says a designer must take all reasonable steps so that, if the work were built to that design, it would comply. Regulation 11F says that person must have the skills, knowledge, experience and behaviours for the work, or the organisation must have the organisational capability. Kalapoda's article in Construction Management says AI cannot be a dutyholder. A chat tool does not sign the drawing.
Does this apply to a sole trader or a small firm?
If you carry out the design work or the building work, regulation 11F applies to you. Where there is only one contractor, regulation 11D treats that contractor as the principal contractor. Where that is so and there is only one designer, that designer must fulfil the principal designer duties. GOV.UK says that if a domestic client does not appoint a principal designer or principal contractor, the designer in control of the design phase and the contractor in control of the construction phase take those roles. You still check the drawing and put your name on what you are willing to issue. If you do not meet the competence test, regulation 11E says the request must not be accepted, apart from the trainee exception on that page.
Is a house extension a higher-risk building?
Not because it is an extension. GOV.UK says a higher-risk building has at least 7 storeys or is at least 18 metres high, and has at least 2 residential units, or is a hospital or a care home. Gateway 2 and Gateway 3 are the names the Building Safety Regulator's FAQ uses for the hold points on that work. A building that is not a higher-risk building uses the separate building control route GOV.UK describes. The duty to check a design you produced is the wider rule in Part 2A.
Is this the same as CDM or a RAMS?
No. GOV.UK says the CDM roles manage the health and safety of workers and anyone around the site, and the building regulations roles are about compliance with building regulations. It says the competence requirements differ. The RAMS guide is the health and safety draft. A competent person still checks that sheet. A chat tool signs neither.
Can I paste the drawing into ChatGPT so it can check it?
Leave the title block out. A name, an address and a phone number on the drawing are the details the guide on what not to paste tells you to keep out of the chat. A reply from the tool is not the check regulation 11K describes. You read the drawing against the job. You put your name on it, or you do not issue it.